| Project No | Project Ranking | Project Name | Agency | Total Cost | Requested Funding |
| 1167 | 1 | City of Fontana Flood Control and Aquifer Recharge Program | City of Fontana | $6,000,000.00 | $1,000,000.00 |
| 1015 | 2 | The Project consists of two detention basins and approximately 11,800 lineal feet of open channel and storm drains from Juniper Flats westerly. It represents Phase 1 of the four phase MDP. | City of Menifee | $6,000,000.00 | $3,500,000.00 |
| 1236 | 3 | San Jacinto Wildlife Area Habitat Sustainability and Enhancement Utilizing Recycled Water | Eastern Municipal Water District | $150,000.00 | $75,000.00 |
| 1272 | 4 | Repairs to the Unlined RCP Reach IVA and Reach IVB Santa Ana Regional Interceptor (SARI) | Santa Ana Watershed Project Authority | $25,000,000.00 | $4,000,000.00 |
| 1096 | 5 | San Jacinto Indirect Potable Reuse | Eastern Municipal Water District | $2,000,000.00 | $1,000,000.00 |
| 1171 | 6 | Perris II Desalination Facility | Eastern Municipal Water District | $57,000,000.00 | $28,700,000.00 |
| 1211 | 7 | Sludge Dewatering, Odor Control, and Primary Sludge Thickening at Plant No. 1, Project No. P1-101 | Orange County Sanitation District (OCSD) | $100,000,000.00 | $1,000,000.00 |
| 1205 | 8 | Storm Water Capture and Groundwater Recharge in the Perris North Groundwater Management Zone | Eastern Municipal Water District | $200,000.00 | $100,000.00 |
| 1190 | 9 | Cactus Basins No. 3 and No. 3A | San Bernardino County Flood Control District | $10,000,000.00 | $1,000,000.00 |
| 1104 | 10 | Temescal Gardens Online | Elsinore Valley Municipal Water District | $300,000.00 | $200,000.00 |
| 1173 | 11 | Hemet/San Jacinto Integrated Recharge and Recovery Program Phase II | Eastern Municipal Water District | $2,400,000.00 | $1,800,000.00 |
| 1136 | 12 | Groundwater Replenishment System - Flow Equalization | Orange County Water District | $23,218,000.00 | $5,804,500.00 |
| 1113 | 13 | Regional Recycling Plant No.5 Expansion | Inland Empire Utilities Agency | $70,000,000.00 | $52,500,000.00 |
| 1117 | 14 | RP-5 De-bottlenecking and RP-2 Capacity Improvement | Inland Empire Utilities Agency | $39,000,000.00 | $29,250,000.00 |
| 1047 | 15 | Industrial Way Water Quality and Storm Drain Improvement Project | city of costa mesa | $3,000,000.00 | $2,400,000.00 |
| 1082 | 16 | Arlington Desalter Connection Project No. 27-1208 & Western Municipal Water District Promenade Connection | City of Corona | $800,000.00 | $400,000.00 |
| 1188 | 17 | West Fontana Basin | San Bernardino County Flood Control District | $10,000,000.00 | $2,000,000.00 |
| 1181 | 18 | Perris II Desalter Ancillary Facilities | Eastern Municipal Water District | $42,000,000.00 | $31,500,000.00 |
| 1135 | 19 | Groundwater Replenishment System Expansion | Orange County Water District | $104,000,000.00 | $26,000,000.00 |
| 1103 | 20 | San Jacinto River Gap Project | Riverside County Flood Control & Water Conservation District | $40,000,000.00 | $30,000,000.00 |
| 1250 | 21 | Cucamonga Creek Watershed Regional Water Quality Project (Mill Creek Wetlands) | City of Ontario | $20,000,000.00 | $10,000,000.00 |
| 1166 | 22 | Infiltration and Inflow Reduction Program | Costa Mesa Sanitary District | $3,000,000.00 | $2,400,000.00 |
| 1226 | 23 | Brine Line (SARI) SCADA System | Santa Ana Watershed Project Authority | $25,000,000.00 | $4,000,000.00 |
| 1291 | 24 | Place-Based GIS Land Use Design Tool to Protect Watershed Function in the Upper Santa Ana River Watershed | California Resource Connections, Inc. | $475,000.00 | $475,000.00 |
| 1168 | 25 | Modjeska Park Parking Detention/Infiltration Facility (Design Only) | City of Anaheim | $250,000.00 | $125,000.00 |
| 1160 | 26 | Constructed Wetland Habitat Restoration and Water Reclamation project for the Santa Ana River Borrow Pit. | San Bernardino Valley Water Conservation District | $4,400,000.00 | $1,000,000.00 |
| 1180 | 27 | Cactus Basins No. 4 and No. 5 | San Bernardino County Flood Control District | $21,600,000.00 | $6,600,000.00 |
| 1090 | 28 | San Bernardino National Forest Ecological Restoration and Watershed Improvement | USDA Forest Service - San Bernardino National Forest | $8,000,000.00 | $1,000,000.00 |
| 983 | 29 | East Garden Grove Wintersburg Channel Urban Runoff Diversion Project, Phase I | CIty of Huntington Beach | $5,488,700.00 | $5,200,000.00 |
| 1163 | 30 | Cable Creek Basin and Spreading Grounds | San Bernardino County Flood Control District | $1,000,000.00 | $250,000.00 |
| 1000 | 31 | Characterization and optimization of cost-effective treatment wetlands for surface water quality improvement | Santa Ana Watershed Project Authority | $300,000.00 | $150,000.00 |
| 1162 | 32 | Sun City Force Main and Recycled Water Pipeline Replacement | Eastern Municipal Water District | $12,610,000.00 | $9,458,000.00 |
| 1247 | 33 | Arlington Basin Water Quality Improvement Project | Western Municipal Water District | $726,000.00 | $216,000.00 |
| 987 | 34 | San Jacinto Urban Runoff Treatment & Control | Lake Elsinore and San Jacinto Watersheds Authority | $250,000.00 | $125,000.00 |
| 1214 | 35 | Pharmaceutical Collection Program | Orange County Sanitation District (OCSD) | $185,000.00 | $90,000.00 |
| 986 | 36 | San Jacinto Watershed Nutrient TMDL Pollutant Trading Study | Lake Elsinore and San Jacinto Watersheds Authority | $250,000.00 | $125,000.00 |
| 948 | 37 | The Quail Valley Groundwater Infiltration Improvements Project | City of Menifee | $100.00 | $250,000.00 |
| 1133 | 38 | Sunset Gap Seawater Intrusion | Orange County Water District | $700,000.00 | $175,000.00 |
| 1094 | 39 | Chino Creek Multipurpose Corridor | Inland Empire Utilities Agency | $13,900,000.00 | $10,425,000.00 |
| 988 | 40 | San Jacinto River Riparian Habitat Restoration | Lake Elsinore and San Jacinto Watersheds Authority | $300,000.00 | $150,000.00 |
| 1176 | 41 | Mission Zanja Creek Feasibility Study | San Bernardino County Flood Control District | $1,000,000.00 | $250,000.00 |
| 989 | 42 | Lake Elsinore Water Quality Modeling | Lake Elsinore and San Jacinto Watersheds Authority | $300,000.00 | $150,000.00 |
| 1216 | 43 | IEUA Regional Water Budget Program | Inland Empire Utilities Agency | $315,000.00 | $200,000.00 |
| 1075 | 44 | Enhanced Stormwater Capture and Recharge along the Santa Ana River | San Bernardino Valley Municipal Water District | $8,000,000.00 | $6,000,000.00 |
| 1186 | 45 | Etiwanda/San Sevaine Basins 1 through 4 | San Bernardino County Flood Control District | $4,000,000.00 | $1,000,000.00 |
| 1213 | 46 | Regional Residential Landscape Retrofit Program | Inland Empire Utilities Agency | $315,000.00 | $200,000.00 |
| 975 | 47 | Lake Elsinore Alum/Phoslock Treatment | Lake Elsinore and San Jacinto Watersheds Authority | $2,500,000.00 | $1,250,000.00 |
| 1206 | 48 | Watershed Action Plan | Inland Empire Utilities Agency | $1,000,000.00 | $750,000.00 |
| 1129 | 49 | Drainage A Detention Basin | City of Chino | $5,200,000.00 | $3,900,000.00 |
| 1201 | 50 | IEUA Regional Landscape Evaluation Program | Inland Empire Utilities Agency | $165,000.00 | $100,000.00 |
| 1208 | 51 | Regional Residential Landscape Financing Program | Inland Empire Utilities Agency | $240,000.00 | $150,000.00 |
| 1219 | 52 | Regional Commercial Incentive Program | Inland Empire Utilities Agency | $415,000.00 | $250,000.00 |
| 985 | 53 | Lake Elsinore & Canyon Lake Nutrient TMDL Monitoring | Lake Elsinore and San Jacinto Watersheds Authority | $1,500,000.00 | $750,000.00 |
| 1240 | 54 | Chino Creek Wellfield, Wells 1, 2, and 3 | Western Municipal Water District | $6,700,000.00 | $1,675,000.00 |
| 1143 | 55 | Central Orange County Trash Reduction Project | Orange County Coastkeeper | $355,408.00 | $266,566.00 |
| 1215 | 56 | La Sierra Pipeline Project | Western Municipal Water District | $16,000,000.00 | $3,000,000.00 |
| 1174 | 57 | Quail Valley Sewer Improvements (Subarea 9) | Eastern Municipal Water District | $18,932,000.00 | $14,199,000.00 |
| 1164 | 58 | Orange County LID Implementation Project | Orange County Coastkeeper | $420,481.00 | $315,361.00 |
| 1217 | 59 | Regional Public Sector Program | Inland Empire Utilities Agency | $665,000.00 | $500,000.00 |
| 974 | 60 | Lake Elsinore Fishery Enhancement | Lake Elsinore and San Jacinto Watersheds Authority | $1,700,000.00 | $850,000.00 |
| 1003 | 61 | Mill Creek Diversion Project | Orange County Water District | $7,000,000.00 | $1,750,000.00 |
| 1158 | 62 | Brine Line (SARI) Flow Equalization Structure | Santa Ana Watershed Project Authority | $2,000,000.00 | $1,500,000.00 |
| 951 | 63 | River Road Treatment Wetlands | Orange County Water District | $8,500,000.00 | $2,125,000.00 |
| 1270 | 64 | San Bernardino Clean Water Factory – Phase I | City of San Bernardino Municipal Water Department | $2,728,776.00 | $1,000,000.00 |
| 1243 | 65 | Borrego Canyon Wash Stabilization and Restoration Project | County of Orange/OC Watersheds | $3,232,000.00 | $1,939,200.00 |
| 1278 | 66 | Wells 21 and 22 Project | Irvine Ranch Water District | $39,768,000.00 | $10,000,000.00 |
| 1049 | 67 | Upper Santa Ana Watershed Alluvial Scrub Habitat Restoration Project and Mitigation Banking Assessment | San Bernardino Valley Water Conservation District | $225,000.00 | $130,000.00 |
| 955 | 68 | Cypress Channel Multipurpose Corridor | Inland Empire Utilities Agency | $7,600,000.00 | $5,700,000.00 |
| 1279 | 69 | Wineville Extension Pipeline | Inland Empire Utilites Agency | $11,212,500.00 | $8,409,375.00 |
| 1281 | 70 | Baker Water Treatment Plant Project | IRVINE RANCH WATER DISTRICT | $62,000,000.00 | $10,000,000.00 |
| 1089 | 71 | Temescal Gardens | Elsinore Valley Municipal Water District | $1,000,000.00 | $750,000.00 |
| 1169 | 72 | Strand Ranch Water Banking Project Recovery Wells and Conveyance Facilities | Irvine Ranch Water District | $7,353,000.00 | $1,800,000.00 |
| 1260 | 73 | Mid-Basin Injection Project | Orange County Water District | $18,000,000.00 | $4,500,000.00 |
| 1016 | 74 | Santa Ana Watershed Vireo Monitoring and Breeding Bird Surveys | Santa Ana Watershed Association | $1,167,846.00 | $875,885.00 |
| 1128 | 75 | Big Bear Lake Hypolimnetic Oxygenation System | Santa Ana Watershed Project Authority | $1,500,000.00 | $1,125,000.00 |
| 1280 | 76 | Renewable Energy Expansion Program | Inland Empire Utilities Agency | $4,000,000.00 | $3,000,000.00 |
| 1283 | 77 | Brine Line Maintenance Access Structures, Reach V and Reach IVB | Santa Ana Watershed Project Authority | $5,600,000.00 | $4,600,000.00 |
| 1111 | 78 | 930-Zone Pipeline and Reservoir, Expansion of the CCWRF-RP-1 S.Zone Pump Station and Installation of a Parallel Line to RP-1 Outfall | Inland Empire Utilities Agency | $39,338,000.00 | $29,503,500.00 |
| 990 | 79 | Stormwater Treatment Wetlands for Canyon Lake | Lake Elsinore and San Jacinto Watersheds Authority | $300,000.00 | $150,000.00 |
| 1116 | 80 | Lake Mathews Watershed Master Water Quality Improvement Project Phase II | Riverside County Flood Control & Water Conservation District | $8,000,000.00 | $6,000,000.00 |
| 943 | 81 | In-Conduit Hydroelectric Project | NLine Energy, Inc. | $950,000.00 | $450,000.00 |
| 1185 | 82 | Lytle Cajon Basin | San Bernardino County Flood Control District | $1,000,000.00 | $250,000.00 |
| 1002 | 83 | Fletcher Basin Rehabilitation | Orange County Water District | $5,000,000.00 | $1,250,000.00 |
| 976 | 84 | Canyon Lake Dredging Enhancements | Lake Elsinore and San Jacinto Watersheds Authority | $550,000.00 | $275,000.00 |
| 999 | 85 | Orange County Regional Stormwater Infiltration Program | Orange County Water Distict | $2,000,000.00 | $500,000.00 |
| 1269 | 86 | Brine Line (SARI) Solids Control Structures | Santa Ana Watershed Project Authority | $2,000,000.00 | $1,500,000.00 |
| 1229 | 87 | East Diamond Valley Recycled Water Storage Pond and Distribution Pipeline Project | Eastern Municipal Water District | $10,783,600.00 | $8,087,700.00 |
| 1200 | 88 | ARTIC Use of GWRS Water for Irrigation and Groudwater Recharge | City of Anaheim | $4,000,000.00 | $2,000,000.00 |
| 1288 | 89 | Borrego Canyon Wash Bypass Channel Improvements within the portion of Shea/Baker Ranch Property (Bypass Channel) | Shea/Baker Ranch, LLC | $15,500,000.00 | $6,200,000.00 |
| 1212 | 90 | Chino II Desalter Brine Minimization | Western Municipal Water District | $30,600,000.00 | $4,590,000.00 |
| 977 | 91 | Canyon Lake Alum/Phoslock Treatment | Lake Elsinore and San Jacinto Watersheds Authority | $1,500,000.00 | $750,000.00 |
| 1227 | 92 | Perchlorate Wellhead Treatment System Pipelines | West Valley Water District | $1,541,000.00 | $1,541,000.00 |
| 1020 | 93 | Water Conservation Demonstration Garden | San Bernardino Valley Municipal Water District | $115,000.00 | $86,250.00 |
| 1130 | 94 | Santiago Enhanced Recharge | Orange County Water District | $840,000.00 | $210,000.00 |
| 945 | 95 | Hypolimnetic Oxygenation System for Canyon Lake | Lake Elsinore and San Jacinto Watersheds Authority | $800,000.00 | $400,000.00 |
| 1137 | 96 | Enhanced Water Conservation at Prado | Orange County Water District | $5,500,000.00 | $1,375,000.00 |
| 1088 | 97 | Magnolia Channel Detention Basin | City of Chino | $83,600.00 | $62,700.00 |
| 981 | 98 | Santiago Basins Pump Station | Orange County Water District | $3,100,000.00 | $775,000.00 |
| 1265 | 99 | Riverside North Aquifer Storage and Recovery Project | City of Riverside | $12,500,000.00 | $2,000,000.00 |
| 1275 | 100 | A Shared Workspace is the Foundation for Collaborative Watershed Management. | S4S Solutions Inc. | $80,000.00 | $60,000.00 |
| 984 | 101 | Water Use Effieciency Program | City of Ontario Municipal Utlities Company | $150,558.00 | $75,218.00 |
| 1095 | 102 | Perchlorate Wellhead Treatment System Wells and SCADA | West Valley Water District | $1,315,000.00 | $1,315,000.00 |
| 1234 | 103 | The San Jacinto Citrus In-Lieu Recycled Water Pond Pump Station and Distribution Pipeline Project | Eastern Municipal Water District | $7,240,000.00 | $5,430,000.00 |
| 1149 | 104 | Santa Ana River Interceptor (SARI) Line Relocation Project | Orange County Flood Control District | $86,000,000.00 | $43,000,000.00 |
| 1172 | 105 | Quail Valley Sewer Improvements (Subareas 1-8) | Eastern Municipal Water District | $56,762,000.00 | $42,572,000.00 |
| 1300 | 106 | Inland Empire Brine Line Capacity Pool Program | Santa Ana Watershed Project Authority | $6,025,000.00 | $4,150,000.00 |
| 1018 | 107 | Perris Water Filtration Plant Reject Recovery Facility | Eastern Municipal Water District | $6,765,828.00 | $5,074,371.00 |
| 1284 | 108 | Natural Treatment System Facility No. 62 (NTS-62) | IRVINE RANCH WATER DISTRICT | $2,460,000.00 | $440,000.00 |
| 1287 | 109 | Enhanced Stormwater Capture and Recharge along the Santa Ana River Phase II | San Bernardino Valley Municipal Water District | $22,000,000.00 | $16,500,000.00 |
| 1050 | 110 | 14th Street Groundwater Recharge and Storm Water Quality Treatment Integration Facility | City of Upland | $5,000,000.00 | $3,750,000.00 |
| 1091 | 111 | Recycled Water Transmission Main (Santa Ana River Segment) | City of Riverside | $26,000,000.00 | $2,000,000.00 |
| 965 | 112 | Fairview Park Wetlands and Riparian Habitat Project | City of Costa Mesa | $4,560,000.00 | $2,200,000.00 |
| 1132 | 113 | Miraloma Recharge Basin | Orange County Water District | $6,100,000.00 | $1,525,000.00 |
| 1170 | 114 | EMWD Desalination Recovery Enhancement and Brine Concentrate Management Demonstration Facility | Eastern Municipal Water District | $12,000,000.00 | $9,000,000.00 |
| 1092 | 115 | Groundwater Interception and Conveyance System for Selenium Load Reduction at the Lower Peters Canyon Wash, Orange County, California | Orange County Watersheds Program | $1,250,000.00 | $500,000.00 |
| 1147 | 116 | East Garden Grove-Wintersburg Channel (OCFCD Facility No. C05) from Tidegates to upstream Warner Avenue. | Orange County, Public Works, Flood Control Section, Flood Programs | $44,000,000.00 | $11,000,000.00 |
| 1152 | 117 | East Garden Grove-Wintersburg Channel (OCFCD Facility No. C05) from upstream Warner Avenue to downstream Goldenwest Street. | Orange County, Public Works, Flood Control Section, Flood Program | $22,000,000.00 | $5,500,000.00 |
| 1007 | 118 | Randolph Creek Water Quality and Habitat Enhancement Project | City of Brea | $870,000.00 | $700,000.00 |
| 998 | 119 | Chino Creek Wetlands | Orange County Water District | $12,000,000.00 | $3,000,000.00 |
| 958 | 120 | Colored Water Treatment Facility Technology Replacement and Expansion | Mesa Consolidated Water District | $24,000,000.00 | $2,000,000.00 |
| 1134 | 121 | Mid-Basin Injection Demonstration | Orange County Water District | $4,900,000.00 | $1,225,000.00 |
| 1277 | 122 | Brookhurst Widening Bio-Swale and Synthetic Turf Installation | City of Anaheim | $1,600,000.00 | $800,000.00 |
| 962 | 123 | North Basin Groundwater Protection Project | Orange County Water District | $42,000,000.00 | $10,500,000.00 |
| 1151 | 124 | Irvine Ranch Water District Advanced Metering Infrastructure (AMI) Project | Irvine Ranch Water District | $2,125,000.00 | $500,000.00 |
| 1220 | 125 | French Valley Recycled Water Distribution Pipeline Project | Eastern Municipal Water District | $3,192,800.00 | $2,394,600.00 |
| 1237 | 126 | The Menifee Recycled Water Pond Pump Station and Distribution Pipeline Project | Eastern Municipal Water District | $11,980,320.00 | $8,985,240.00 |
| 1165 | 127 | San Bernardino River Corridor Revitalization | California Resource Connections | | |
| 1115 | 128 | Hickory / Banana Basin Turout Flow Meter | Inland Empire Utilities Agency | $101,567.00 | $76,175.00 |
| 1296 | 129 | Orange Park Acres Groundwater Supplies and Conveyance Facilities | Irvine Ranch Water District (IRWD) | $25,000,000.00 | $6,250,000.00 |
| 1178 | 130 | Well 17 & 18 Water Treatment Facility | Rubidoux Community Services District | $5,000,000.00 | $5,000,000.00 |
| 1264 | 131 | Second Lower Cross Feeder Project | Municipal Water District of Orange County | $50,000,000.00 | $12,500,000.00 |
| 994 | 132 | City of Tustin Main Street Facility Improvements | City of Tustin | $300,000.00 | $150,000.00 |
| 1244 | 133 | Riverside-Corona Feeder Wells | Western Municipal Water District | $7,500,000.00 | $2,000,000.00 |
| 970 | 134 | Serrano Creek Restoration Plan | County of Orange | $3,345,212.00 | $1,338,085.00 |
| 1184 | 135 | SMART Landscapes | Irvine Ranch Water District | $290,000.00 | $100,000.00 |
| 1245 | 136 | Chino II Desalter Treated Water Pump Station | Western Municipal Water District | $2,970,000.00 | $1,485,000.00 |
| 1106 | 137 | Agency Wide Aeration System Modifications | Inland Empire Utilities Agency | $2,000,000.00 | $1,500,000.00 |
| 1032 | 138 | Construction and Quantitative Evaluation of the Low Impact Development Retrofit Project for Orange County Public Works Glassell Yard, Orange, California | County of Orange/OC Watersheds Program | $3,000,000.00 | $2,000,000.00 |
| 1025 | 139 | Model Institutional Water Conservation Makeover | San Bernardino Valley Municipal Water District | $345,000.00 | $258,750.00 |
| 1045 | 140 | Water Use Efficiency Improvements/Brackish Groundwater Treatment and Constructed Wetland Installation at Yorba Regional Park | City of Anaheim | $200,000.00 | $100,000.00 |
| 1230 | 141 | Haster Retarding Basin and Pump Station (OCFCD Facility No. C05B02/C05PS1) | Orange County, Public Works, Flood Control Section, Flood Programs | $27,119,078.00 | $6,779,770.00 |
| 1242 | 142 | Huntington Harbour Copper Reduction Project | Orange County Coastkeeper | $630,000.00 | $472,500.00 |
| 954 | 143 | Local Recycled Water Laterals Construction | Inland Empire Utilities Agency | $25,000,000.00 | $12,500,000.00 |
| 1024 | 144 | Restoration of the Lower Santa Ana River Marsh | Orange Coast River Park | $2,260,000.00 | $1,000,000.00 |
| 1105 | 145 | City of Fontana Local Recycled Water Distribution Facilities | Inland Empire Utilities Agency | $8,000,000.00 | $6,000,000.00 |
| 1138 | 146 | Montclair Basin SCADA improvments | Inland Empire Utilities Agency | $132,567.00 | $99,425.00 |
| 1040 | 147 | Eastvale Water Recycling Project | Jurupa Community Services District | $28,000,000.00 | $1,000,000.00 |
| 1202 | 148 | San Jacinto Recycled Water Distribution Pipeline Project | Eastern Municipal Water District | $3,809,480.00 | $2,857,110.00 |
| 1248 | 149 | Huntington Harbour Water Quality Improvemnent Program | Orange County Coastkeeper | $320,200.00 | $240,150.00 |
| 1126 | 150 | RP-5 Wind Turbine | Inland Empire Utilities Agency | $3,000,000.00 | $2,250,000.00 |
| 1125 | 151 | Turner Basin Improvements | Inland Empire Utilities Agency | $13,453,000.00 | $10,089,750.00 |
| 1057 | 152 | DWR Pump Station Alternative 1 | San Bernardino Valley Municipal Water District | $23,000,000.00 | $17,475,000.00 |
| 1038 | 153 | Non-Potable Water Distribution System and Van Buren Bridge Recycled Water Pipeline | Jurupa Community Services District_ | $8,920,000.00 | $1,000,000.00 |
| 968 | 154 | Five Coves and Lincoln Basins Bypass Pipeline | Orange County Water District | $6,440,000.00 | $1,610,000.00 |
| 1005 | 155 | Prado Basin Sediment Management Project | Orange County Water District | $2,500,000.00 | $625,000.00 |
| 1157 | 156 | Cypress Nature Park Restoration Project | City of Cypress | $1,557,180.00 | $1,443,180.00 |
| 1107 | 157 | Local Recycled Water Laterals Construction | Inland Empire Utilities Agency | $25,000,000.00 | $18,750,000.00 |
| 1109 | 158 | Central Area Recycled Water Project | Inland Empire Utilities Agency | $27,920,000.00 | $20,940,000.00 |
| 1305 | 159 | San Bernardino Clean Water Factory – Phase IV | City of San Bernardino Municipal Water Department | $122,624,000.00 | $61,312,000.00 |
| 991 | 160 | Temescal Creek Master Trail and Park Project | Inland Empire Waterkeeper | $3,030,000.00 | $3,000,000.00 |
| 1123 | 161 | Ely Basin Cla Valve Replacement and Electrial Service | Inland Empire Utilities Agency | $98,090.00 | $73,568.00 |
| 1118 | 162 | Jurupa Pumpstation | Inland Empire Utilities Agency | $871,487.00 | $653,615.00 |
| 1120 | 163 | Motorized Gate Actuator Installation at RP-3 | Inland Empire Utilities Agency | $710,776.00 | $533,082.00 |
| 1241 | 164 | Co-generation Facilities Cooling Water System Modifications and Upgrades Project J-109. | Orange County Sanitation District (OCSD) | $9,094,000.00 | $1,000,000.00 |
| 1293 | 165 | Syphon Reservoir Expansion | Irvine Ranch Water District | $70,000,000.00 | $17,500,000.00 |
| 1026 | 166 | Water Recycling Demonstration Project | City of Anaheim | $8,000,000.00 | $1,600,000.00 |
| 1154 | 167 | East Garden Grove-Wintersburg Channel (OCFCD Facility No. C05) from upstream Oceanview Channel (C06) Confluence to downstream Beach Boulevard. | Orange County, Public Works, Flood Control Section, Flood Programs | $11,000,000.00 | $2,750,000.00 |
| 1156 | 168 | East Garden Grove-Wintersburg Channel (OCFCD Facility No. C05) from upstream Quartz Street to upstream Bushard Street. | Orange County, Public Works, Flood Control Section, Flood Programs | $15,000,000.00 | $37,500,000.00 |
| 1041 | 169 | Roger B. Teagarden Ion Exchange Treatment Plant (IXP) Expansion | Jurupa Community Services District | $10,200,000.00 | $1,000,000.00 |
| 1155 | 170 | East Garden Grove-Wintersburg Channel (OCFCD Facility No. C05) from upstream Beach Boulvevard to downstream Woodruff Street. | Orange County, Public Works, Flood Control Section, Flood Programs | $9,600,000.00 | $2,400,000.00 |
| 1199 | 171 | Baseline Feeder Well Replacement Project | San Bernardino Valley Municipal Water District | $7,430,000.00 | $5,572,500.00 |
| 966 | 172 | South Basin Groundwater Protection Project Interim Remediation | Orange County Water District | $2,800,000.00 | $700,000.00 |
| 1037 | 173 | West End Pump Station | San Bernardino Valley Municipal Water District | $10,000,000.00 | $7,500,000.00 |
| 1301 | 174 | Well 53 | Irvine Ranch Water District | $1,700,000.00 | $400,000.00 |
| 1302 | 175 | Norco/Stagecoach Park Recycled Waterline | City of Corona Department of Water and Power | $3,700,000.00 | $1,850,000.00 |
| 1179 | 176 | East Garden Grove-Wintersburg Channel (OCFCD Facility No. C05) from 300-feet downstream the intersection of Haster Street/Lampson Avenue to 800-feet upstream. | Orange County, Public Works, Flood Control Section, Flood Programs | $14,560,000.00 | $3,640,000.00 |
| 1266 | 177 | Joint Anaheim/IRWD Well Field | Irvine Ranch Water District | $40,000,000.00 | $5,000,000.00 |
| 1004 | 178 | Recycled Water Reservoir | Orange County Great Park Corporation | $3,500,000.00 | $2,300,000.00 |
| 1298 | 179 | Goldenwest 6 MG Tank | Rubidoux Community Services District | $4,750,000.00 | $4,750,000.00 |
| 1177 | 180 | East Garden Grove-Wintersburg Channel (OCFCD Facility No. C05) from upstream Bushard Street to upstream the intersection of McFadden Street/Brookhurst Street. | Orange County, Public Works, Flood Control Section, Flood Programs | $11,000,000.00 | $2,750,000.00 |
| 1246 | 181 | Arlington Desalter Biodenitrification Construction | Western Municipal Water District | $10,780,000.00 | $5,390,000.00 |
| 1119 | 182 | CMSD #101 West Side Pumping Station Abandonment | Costa Mesa Sanitary District | $3,000,000.00 | $1,000,000.00 |
| 1124 | 183 | City of Chino Hills Local Recycled Water Distribution Facilities | Inland Empire Utilities Agency | $10,000,000.00 | $7,500,000.00 |
| 1187 | 184 | Ocean View Channel (OCFCD Facility No. C06) from upstream of the Confluence with East Garden Grove-Wintersburg Channel (C05) to downstream Beach Boulevard. | Orange County, Public Works, Flood Control Section, Flood Programs | $2,175,000.00 | $543,750.00 |
| 1306 | 185 | San Bernardino Clean Water Factory – Phase V | City of San Bernardino Municipal Water Department | $77,791,000.00 | $38,895,500.00 |
| 1011 | 186 | San Jacinto Watershed Urban and Agricultural Land Use Survey and Impervious Surface Mapping | Western Riverside County Agriculture Coalition | $625,000.00 | $312,500.00 |
| 1290 | 187 | 24" Mission Blvd Pipeline (Carrera to Goldenwest tank) | Rubidoux Community Services District | $1,500,000.00 | $1,500,000.00 |
| 1039 | 188 | Non-Potable Water Distribution System and Indian Hills Wastewater Treatment Plant Rehabilitation | Jurupa Community Services District | $19,520,000.00 | $1,000,000.00 |
| 1303 | 189 | San Bernardino Clean Water Factory – Phase II | City of San Bernardino Municipal Water Department | $18,000,000.00 | $9,000,000.00 |
| 993 | 190 | Tustin Avenue Well | City of Tustin | $4,500,000.00 | $2,250,000.00 |
| 1122 | 191 | City of Chino Local Recycled Water Distribution Facilities | Inland Empire Utilities Agency | $7,000,000.00 | $5,250,000.00 |
| 1144 | 192 | Rhine Channel Remediation Project | Orange County Coastkeeper | $4,000,000.00 | $2,000,000.00 |
| 1097 | 193 | North Trumble Recycled Water Storage Ponds | Eastern Municipal Water District | $12,100,000.00 | $9,075,000.00 |
| 1231 | 194 | Syphon Reservoir Integration Project | Irvine Ranch Water District | $6,900,000.00 | $2,000,000.00 |
| 1307 | 195 | San Bernardino Clean Water Factory – Phase VI | City of San Bernardino Municipal Water Department | $65,593,000.00 | $32,796,500.00 |
| 1087 | 196 | Crescent Avenue Sewer Replacement | City of Buena Park | $2,376,000.00 | $950,400.00 |
| 1112 | 197 | San Sevaine Lateral and Turnouts | Inland Empire Utilities Agency | $2,631,700.00 | $1,973,776.00 |
| 1203 | 198 | Wintersberg Chanel Source Identification Study | Orange County Coastkeeper | $278,000.00 | $208,500.00 |
| 1108 | 199 | Hickory Basin Conservation Berm Outlet Modification | Inland Empire Utilities Agency | $92,752.00 | $69,564.00 |
| 1189 | 200 | Ocean View Channel (OCFCD Facility No. C06) from upstream of Beach Boulevard to downstream of Newland Street. | Orange County, Public Works, Flood Control Section, Flood Programs | $2,570,000.00 | $642,500.00 |
| 1140 | 201 | Jurupa Force Main Outlet Modifications | Inland Empire Utilities Agency | $1,555,113.00 | $1,166,335.00 |
| 1204 | 202 | Santa Ana-Delhi Channel (OCFCD Facility No. F01) from Upper Newport Back Bay to downstream of Mesa Drive. | Orange County, Public Works, Flood Control Section, Flood Programs | $12,350,000.00 | $3,087,500.00 |
| 1238 | 203 | Brea Creek Channel (OCFCD Facility No. A02) at Beach Boulevard. | Orange County, Public Works, Flood Control Section, Flood Programs | $8,400,000.00 | $2,100,000.00 |
| 1295 | 204 | Pacific Avenue 16" and 12" Water Pipeline | Rubidoux Community Services District | $1,000,000.00 | $1,000,000.00 |
| 1207 | 205 | Natural Treatment System Site 67 | Irvine Ranch Water District | $19,700,000.00 | $5,500,000.00 |
| 961 | 206 | Rawlings Reservoir Replacement | City of Tustin | $15,000,000.00 | $7,500,000.00 |
| 1192 | 207 | Westminster Channel (OCFCD Facility No. C04) from downstream Bolsa Chica Street to upstream the intersection of Springdale Street and Edinger Avenue. | Orange County, Public Works, Flood Control Section, Flood Programs | $16,900,000.00 | $4,225,000.00 |
| 1193 | 208 | Westminster Channel (OCFCD Facility No. C04) from upstream the intersection of Springdale Street and Edinger Avenue to downstream Bolsa Avenue. | Orange County, Public Works, Flood Control Section, Flood Programs | $21,000,000.00 | $5,250,000.00 |
| 1233 | 209 | Rubidoux Community Services District Emergency Interconnections | Rubidoux Community Services District | $2,000,000.00 | $2,000,000.00 |
| 995 | 210 | Wilson III Basins Project and Wilson Basins/Spreading Grounds | City of Yucaipa | $9,100,000.00 | $7,100,000.00 |
| 1282 | 211 | Lane Channel (OCFCD Facility No. F08) from Confluence with F05 channel to Von Karman | Orange County, Public Works, Flood Control Section, Flood Programs | $15,500,000.00 | $3,875,000.00 |
| 1285 | 212 | Lane Channel (OCFCD Facility No. F08) from Von Karman to 1000’ downstream Redhill Avenue | Orange County, Public Works, Flood Control Section, Flood Programs | $15,000,000.00 | $3,750,000.00 |
| 1251 | 213 | Fullerton Creek Channel (OCFCD Facility No. A03) from downstream Western Ave to downstream Beach Blvd. | Orange County, Public Works, Flood Control Section, Flood Programs | $9,800,000.00 | $2,450,000.00 |
| 1267 | 214 | Planning & Integration Assistance Program | California Resource Connections | $200,000.00 | $150,000.00 |
| 1191 | 215 | Ocean View Channel (OCFCD Facility No. C06) from downstream of Bushard Street to downstream of Brookhurst Street. | Orange County, Public Works, Flood Control Section, Flood Programs | $5,600,000.00 | $1,400,000.00 |
| 978 | 216 | Raymond Basin Enhancement Project | Orange County Water District | $3,600,000.00 | $900,000.00 |
| 1209 | 217 | Newland Storm Channel (OCFCD Facility No. C05S01) from Confluence with C05 channel to downstream McFadden Avenue. | Orange County, Public Works, Flood Control Section, Flood Programs | $10,000,000.00 | $2,500,000.00 |
| 1074 | 218 | Seven Oaks Dam and Reservoir Construction Area | San Bernardino Valley Municipal Water District | $31,322,346.00 | $23,491,760.00 |
| 1076 | 219 | Santa Ana River Construction Area | San Bernardino Valley Municipal Water District | $41,061,083.00 | $30,795,812.00 |
| 1197 | 220 | NEW 12-INCH RECYCLED WATER MAIN TO THE REDHILL GOLF COURSE | CUCAMONGA VALLEY WATER DISTRICT | $600,000.00 | $450,000.00 |
| 1256 | 221 | Carbon Creek Channel (OCFCD Facility No. B01) from upstream Beach Boulevard to upstream Dale Street. | Orange County, Public Works, Flood Control Section, Flood Programs | $7,000,000.00 | $1,750,000.00 |
| 1225 | 222 | PROPOSED 8-INCH REDHILL PARK LATERAL | CUCAMONGA VALLEY WATER DISTRICT | $336,000.00 | $252,000.00 |
| 1093 | 223 | 1N09 Reconstruction and Water Quality Improvement | USDA Forest Service - San Bernardino National Forest | $430,000.00 | $215,000.00 |
| 960 | 224 | Prado Basin Sediment Management Demonstration Project | Orange County Water District | $4,250,000.00 | $1,062,500.00 |
| 1114 | 225 | Construction Circle Recycled Water Conversion Project | Irvine Ranch Water District | $1,000,000.00 | $790,000.00 |
| 1210 | 226 | Newland Storm Channel (OCFCD Facility No. C05S01) from downstream McFadden Avenue to downstream Bolsa Avenue | Orange County, Public Works, Flood Control Section, Flood Programs | $10,000,000.00 | $2,500,000.00 |
| 1255 | 227 | Carbon Creek Channel (OCFCD Facility No. B01) from upstream Orange to upstream Beach Boulevard. | Orange County, Public Works, Flood Control Section, Flood Programs | $7,500,000.00 | $1,875,000.00 |
| 979 | 228 | Placentia Basin Enhancement Project | Orange County Water District | $3,800,000.00 | $950,000.00 |
| 1252 | 229 | Fullerton Creek Channel (OCFCD Facility No. A03) from downstream Beach Blvd. including undercrossing to downstream I-5 Freeway. | Orange County, Public Works, Flood Control Section, Flood Programs | $8,400,000.00 | $2,100,000.00 |
| 1253 | 230 | Fullerton Creek Channel (OCFCD Facility No. A03) from downstream I-5 Freeway to downstream Dale Street. | a. Orange County, Public Works, Flood Control Section, Flood Programs | $8,400,000.00 | $2,100,000.00 |
| 1254 | 231 | Carbon Creek Channel (OCFCD Facility No. B01) from downstream Western Avenue to upstream Orange (including both undercrossings). | Orange County, Public Works, Flood Control Section, Flood Programs | $9,100,000.00 | $2,275,000.00 |
| 1008 | 232 | Recharge Water Sediment Removal Demonstration Project | Orange County Water District | $1,570,000.00 | $392,500.00 |
| 1198 | 233 | Active Recharge Project in the Tributaries of the Santa Ana River | San Bernardino Valley Municipal Water District | | |
| 1159 | 234 | University of California Irvine Water Use Efficiency Upgrades | Irvine Ranch Water District | $115,000.00 | $34,000.00 |
| 1239 | 235 | Perris Valley Recycled Water Distribution Pipeline Project | Eastern Municipal Water District | $3,821,520.00 | $2,866,140.00 |
| 1014 | 236 | Recharge Water Sediment Removal Project | Orange County Water District | $26,000,000.00 | $6,500,000.00 |
| 1043 | 237 | Platinum Triangle/ARTIC and Disneyland Resort Area Water Recycling Project | City of Anaheim | $16,500,000.00 | $8,250,000.00 |
| 1297 | 238 | Peters Canyon Channel (OCFCD Facility No. F06) from Barranca Parkway to Warner Avenue. | Orange County, Public Works, Flood Control Section, Flood Programs | $16,800,000.00 | $4,200,000.00 |
| 1001 | 239 | Temescal Creek Wetlands | Orange County Water District | $3,000,000.00 | $750,000.00 |
| 1196 | 240 | Citywide Street Median Rehabilitation Project | City of Garden Grove | $6,161,000.00 | $4,000,000.00 |
| 1099 | 241 | Ball Road Regional Recycled Water Project | City of Anaheim | $20,000,000.00 | $10,000,000.00 |
| 1299 | 242 | Santa Ana-Santa Fe Channel (OCFCD Facility No. F10) from confluence with Peters Canyon Channel to downstream Redhill Avenue. | Orange County, Public Works, Flood Control Section, Flood Programs | $21,000,000.00 | $5,250,000.00 |
| 1257 | 243 | Carbon Creek Channel (OCFCD Facility No. B01) from upstream Gilbert Street to downstream I-5 Freeway including B01P01 & B01B02 | Orange County, Public Works, Flood Control Section, Flood Programs | $20,000,000.00 | $5,000,000.00 |
| 1294 | 244 | Peters Canyon Channel (OCFCD Facility No. F06) from Confluence with San Juan Creek Channel (F05) to downstream Barranca parkway. | Orange County, Public Works, Flood Control Section, Flood Programs | $9,800,000.00 | $2,450,000.00 |
| 1228 | 245 | PROPOSED 12-INCH VILLAGE OF HERITAGE | CUCAMONGA VALLEY WATER DISTRICT | $3,600,000.00 | $27,000,000.00 |
| 1079 | 246 | Lytle Creek Construction Area | San Bernardino Valley Municipal Water District | $13,500,000.00 | $10,125,000.00 |
| 1224 | 247 | Commercial, Industrial & Institutional Water Use Efficiency Upgrades | Irvine Ranch Water District | $3,880,000.00 | $1,000,000.00 |
| 1289 | 248 | Reservoir Management System at 5 Domestic Water Reservoirs | Irvine Ranch Water District | $2,500,000.00 | $1,250,000.00 |
| 980 | 249 | Santiago Basins Intertie | Orange County Water District | $2,800,000.00 | $700,000.00 |
| 1042 | 250 | Shallow Aquifer Pumping for Non-potable Uses | City of Anaheim | $3,720,000.00 | $1,600,000.00 |
| 1292 | 251 | Tustin Legacy Wells 1, 2, 3, and 4 | Irvine Ranch Water District | | $1,000,000.00 |
| 1081 | 252 | Surface Water Treatment Plant(s) | San Bernardino Valley Municipal Water District | $70,000,000.00 | $52,500,000.00 |
| 1131 | 253 | Recharge Basin Rehabilitation | Orange County Water District | $850,000.00 | $212,500.00 |
| 1053 | 254 | Mentone Pipeline | San Bernardino Valley Municipal Water District | $1,090,000.00 | $817,500.00 |
| 1101 | 255 | Orange County/Beaumont Conjunctive Use Water Project | City of Anaheim | $66,000,000.00 | $33,000,000.00 |
| 1175 | 256 | Yockey/Newland Storm Drain Line B-5 Phase 2 | City of Garden Grove | $5,067,000.00 | $3,800,000.00 |
| 1276 | 257 | Santa Ana Gardens Channel (OCFCD Facility No. F02) from downstream Alton to Segerstrom. | Orange County, Public Works, Flood Control Section, Flood Programs | $11,200,000.00 | $2,800,000.00 |
| 1070 | 258 | Redlands Reservoir | San Bernardino Valley Municipal Water District | $1,800,000.00 | $1,350,000.00 |
| 1304 | 259 | San Bernardino Clean Water Factory – Phase III | City of San Bernardino Municipal Water Department | $6,981,169.00 | $3,490,585.00 |
| 967 | 260 | MTBE Interim Remediation | Orange County Water District | $15,000,000.00 | $3,750,000.00 |
| 1027 | 261 | Lytle Creek Turnout | San Bernardino Valley Municipal Water District | $2,300,000.00 | $172,500.00 |
| 1078 | 262 | Devil Canyon Construction Area | San Bernardino Valley Municipal Water District | $1,720,000.00 | $1,290,000.00 |
| 1031 | 263 | Central Feeder Pipeline | San Bernardino Valley Municipal Water District | $41,213,536.00 | $30,910,152.00 |
| 1084 | 264 | Alamitos Barrier Improvement Project | Orange County Water District | $20,000,000.00 | $5,000,000.00 |
| 1061 | 265 | Yucaipa Lakes Pipeline Replacement | San Bernardino Valley Municipal Water District | $760,000.00 | $570,000.00 |
| 1029 | 266 | PVRWRF Biosolids Dryer Facility | Eastern Municipal Water District | $13,000,000.00 | $7,800,000.00 |
| 1100 | 267 | RP-1 Cogeneration Facility Expansion | Inland Empire Utilities Agency | $8,300,000.00 | $6,225,000.00 |
| 1121 | 268 | RP-2 Cogeneration Facility Expansion | Inland Empire Utilities Agency | $4,000,000.00 | $3,000,000.00 |
| 1148 | 269 | Digester Gas Cleaing System | Inland Empire Utilities Agency | $4,479,000.00 | $3,359,250.00 |
| 1161 | 270 | RP-2 Digester Gas System Modifications | Inland Empire Utilities Agency | $2,997,000.00 | $2,247,750.00 |
| 1044 | 271 | Urban Runoff Reuse - Anaheim Hills Golf Course | City of Anaheim | $9,800,000.00 | $4,900,000.00 |
| 1034 | 272 | San Bernardino Pump Station #1 | San Bernardino Valley Municipal Water District | $2,900,000.00 | $2,175,000.00 |
| 1060 | 273 | Baseline Feeder Pump Station (East and/or West ALternative) | San Bernardino Valley Municipal Water District | $3,100,000.00 | $2,325,000.00 |
| 941 | 274 | Construction of a Reclaimed Water Pipeline to Buena Park, California | City of Buena Park | $5,000,000.00 | $500,000.00 |
| 1069 | 275 | San Bernardino Reservoir | San Bernardino Valley Municipal Water District | $4,500,000.00 | $3,375,000.00 |
| 1033 | 276 | Biodiesel Feedstock Production | Eastern Municipal Water District | $13,000,000.00 | $13,000,000.00 |
| 1030 | 277 | Glen Helen Turnout | San Bernardino Valley Municipal Water District | $1,860,000.00 | $1,395,000.00 |
| 1035 | 278 | San Bernardino Pump Station #2 | San Bernardino Valley Municipal Water District | $12,000,000.00 | $9,000,000.00 |
| 1051 | 279 | 9th Street Feeder | San Bernardino Valley Municipal Water District | $24,100,000.00 | $18,075,000.00 |
| 1052 | 280 | South End Feeder | San Bernardino Valley Municipal Water District | $11,500,000.00 | $8,625,000.00 |
| 1059 | 281 | Baseline Feeder West Extension | San Bernardino Valley Municipal Water District | $30,300,000.00 | $22,725,000.00 |
| 1067 | 282 | City Creek Crossing | San Bernardino Valley Municipal Water District | $5,200,000.00 | $3,900,000.00 |
| 1077 | 283 | Morton Canyon Hydroelectric Generation Plant | San Bernardino Valley Municipal Water District | $38,000,000.00 | $28,500,000.00 |
| 1058 | 284 | DWR Pump Station Alternative 2 | San Bernardino Valley Municipal Water District | $23,000,000.00 | $17,475,000.00 |
| 1071 | 285 | North Lake Project | San Bernardino Valley Municipal Water District | $133,000,000.00 | $99,750,000.00 |
| 1150 | 286 | RP-1 Secondary System Modifications | Inland Empire Utilities Agency | $30,200,000.00 | $22,650,000.00 |
| 1127 | 287 | Agency Wide Lighting Improvements | Inland Empire Utilities Agency | $1,670,000.00 | $1,252,500.00 |
| 1183 | 288 | Septic System Source Water Elimination Water Source Protection Project | Rubidoux Community Services District | $3,000,000.00 | $3,000,000.00 |
| 1139 | 289 | Subsurface Recharge | Orange County Water District | $1,000,000.00 | $250,000.00 |
| 1010 | 290 | Water Well Decontamination - City of Redlands | City of Redlands | $2,100,000.00 | $2,000,000.00 |
| 1063 | 291 | Yucaipa Connector | San Bernardino Valley Municipal Water District | $4,500,000.00 | $3,375,000.00 |
| 1064 | 292 | Orange Street Connector Pipeline | San Bernardino Valley Municipal Water District | $4,900,000.00 | $1,225,000.00 |
| 1066 | 293 | Alabama Street Well Field | San Bernardino Valley Municipal Water District | $4,500,000.00 | $3,375,000.00 |
| 996 | 294 | Patterson Street Storm Drain Upgrade | City of Garden Grove | $3,600,000.00 | $3,240,000.00 |
| 1062 | 295 | Yucaipa Lakes Pump Station | San Bernardino Valley Municipal Water District | $12,900,000.00 | $9,675,000.00 |
| 1065 | 296 | Alabama Street Connector Pipeline | San Bernardino Valley Municipal Water District | $9,000,000.00 | $6,750,000.00 |
| 1068 | 297 | Foothill Pipeline Enlargement | San Bernardino Valley Municipal Water District | $25,000,000.00 | $18,750,000.00 |